Block Fabrication of No.5 208,000DWT Bulk Carrier
2019/5/8 view:
On 6 May, 2019, the block fabrication of No.5 208,000DWT Bulk Carrier was carried out at the cutting workshop of NTS. Our General Manager Assistant Mr. Ding Baiying and representatives from the owner FRONTLINE and LR classification society attended this event.
- Pre:Block Fabrication of No.17 208 2019/5/7
- Next:Delivery of 22# 110,000 DWT Pr 2019/5/8